XMight Smart Energy · POM OCP Global Summit 2026 · recap
The Ride-Through Dilemma

ORv3 Took the Central UPS Out.Why Bring It Back?

New grid ride-through requirements put costly central UPS back on the table.

There's another way: Rack-Level Power Orchestration (POM).

90-second cut of the booth loop. Tap full screen and turn your phone sideways to read the charts. Watch on YouTube ↗

Talk to us about POM How POM works →
Shown at OCP Global Summit 2026
Innovation Village (FTS – Power), San Jose · 12–15 October 2026

Simulation · design target. Illustrative rack-level model, not measured data; hardware validation pending. Grid requirements: OCP Base Specification v1.0.0, Interface Specification Between Hyperscalers and Utility Grid for Disturbance Performance (effective Sept 17, 2026). POM is an open specification proposed to OCP Rack & Power.
© 2026 XMight Smart Energy Corp. · xmight.com